NYCT A-36121, A-36138, Fulton Street Station
PRI furnished and installed fiber optic network (FON), security (AICS / CCTV) and public address (PACIS) systems for the brand-new state-of-the-art subway station and shopping center.
LIRR CH-057 – East Side Access
The East Side Access project is a massive effort to finally connect Long Island with Grand Central Station (NY) to help create an additional navigation port between Long Island and NYC. PRI fabricated and supplied 4 electronically operated (EO) remote panels and 4 30A 600V non-fused disconnect switches.
LIRR #6123 – Divide Tower SCADA
PRI updated, furnished and installed a supervisory control and data acquisition (SCADA) at Divide Tower (Hicksville, NY) and 17 Remote Terminal Units (RTU) along the Port Jefferson and Ronkonkoma lines.
LIRR 2nd Track MG Replacement
LIRR added an additional rail track between Farmingdale and Ronkonkoma to enhance travel along Long Island. PRI manufactured and installed two new modular motor generator (MG) buildings in Deer Park and Ronkonkoma Stations and procured and installed a motor generator at Grumman Station to help power the trains travelling on the new 2nd track.
LIRR #6228 - Richmond Hill Substation SCADA (Queens, NY)
PRI manufactured and tested the supervisory control and data acquisition (SCADA) system to replace the older Richmond Hill Traction Power Substation.
NYCT A-36090 – Station Renewal of 6 Stations- Sea Beach Line (Brooklyn, NY)
NYCT was upgrading stations along the Sea Beach subway line between 8th Ave. & Bay Parkway. PRI was responsible for furnishing fiber optic network (FON), security systems (AICS/CCTV), and communication systems at the numerous stations.
NYCT S-32176 - Signal System Modernization of Kings Highway Interlocking
PRI updated the Train Tracking System for for the Staten Island Rail Road Transit Operating Authority (SIRTOA). PRI designed, tested, and installed a Track Sequencing Alarm System (TSAS) as well as an Enhanced Employee Protection System included within the TSAS.
NYCT S-32764, S-32765 – 6th Avenue Interlocking 34th and 4th Street Signal System Modifications
NYCT upgraded stations along the 6th Avenue subway line between 34th and 4th Street. PRI furnished and installed fiber optic network (FON), security (AICS / CCTV), train dispatch system (TDS), tone remote control console (TRCC) systems at the numerous stations along the 6th Avenue Line.
LIRR #6240 LIRR - 3rd Track Heaters
PRI manufactured PLC Cabinets and Contactor Boxes as part of the 3rd Track Heaters project. The heaters, which are controlled by pushbuttons on the PLC Cabinets, are meant to keep ice from forming on the third rail during the winter.
LIRR ETD-40550 - Babylon Yard Substation
PRI designed and built a motor generator (MG) replacement for the LIRR Babylon Yard. PRI designed, built, installed, and tested four cabinets – MG control and MG breaker cabinets, MG PLC and HT PLC, and supplied a motor generator.
100081 - Amtrak SCADA
PRI designed and built three DIOP cabinets for the current Penn Station Jacobs SCADA system. These cabinets are used for Jacobs SCADA system integration utilizing PLC and power distribution cabinets for Penn Station. The three cabinets and one main PLC cabinet were integrated into an existing SCADA system in Penn Station and used to create added Fiber Optic connections for enhanced communication.
LIRR #6266 - Meadowbrook Substation Replacement
PRI designed a supervisory control and data acquisition (SCADA) system with Programmable Logic Controllers (PLC) cabinets for the LIRR’s Traction Power Systems. In addition, PRI manufactured/assembled, delivered, tested, and provided required warranty for the new system.